Time Keeper Challenge (Intermediate)

The Timekeeper Challenge: A 30-Minute Engineering Startup Simulation

Welcome! For the next 30 minutes your team is a startup company. Your product is a mechanical timer built from plastic cups, string, and tape. Design it, fund it, build it, prove it works, and sell it, all while making more money than the other companies in the room.

This page has everything you need. Read it before the event if you can. Teams that arrive with a design sketch and a plan will have a big advantage.

Bring: your worksheet (the one with the QR code that led you here) and a pencil. No electronics may be used to time anything during an official test (see Rules).


1. The Big Picture

Different strategies can win:

Strategy Idea
First to market Get a certified passing device done early and file your report before anyone else.
Lean operator Build something so cheap and simple that your margin is huge.
Precision specialist Spend on testing and refinement to be the most accurate.

2. Timeline

Minute Event
0 "Go!" Payroll starts. The Store and Machine Shop open. Form your team.
12 Proposals due to the Government.
15 Awards announced.
27 Last certified test may begin.
30 Final reports due. Hard stop.

Teams form on their own schedule. There is no deadline, but the payroll is already running (see below).


3. Forming Your Company


4. Labor Costs

Each team member is paid per minute:

Class Rate
Freshman $5 / minute
Sophomore $10 / minute
Junior $15 / minute
Senior $20 / minute
Non-student / faculty / other You name your own rate (minimum $5 / minute)

When does the meter start? At minute 0, when the simulation starts. Recruiting, brainstorming, and writing the proposal all count as work. Every member of your final team is billed from minute 0, even if they joined later.

When does it stop? The moment you submit your final report.

Example: A team of 1 senior, 2 juniors, 1 sophomore, and 1 freshman costs 20 + 15 + 15 + 10 + 5 = $65 per minute. If they submit their final report at minute 28, labor is 28 × $65 = $1,820.

Upperclassmen are fast and expensive. Underclassmen are cheap. Building a good mix is part of the challenge.


5. The Store and Machine Shop

The Store is an unmanned table that is open from minute 0. It runs on the honor system: take what you need, and record everything you take on your worksheet. Stock is limited, and when it's gone it's gone.

Item Price Stock
Large cup (12 oz party cup) $40 10
Small cup (5 oz clear plastic) $20 100
Twine (per length) $30 [TBD] (poor quality and limited, and it may break)
Sharpie $25 [TBD]
Tape (per length) $40 [TBD]
Scissors $100 [TBD]
Fishing line (per length) $100 [TBD] (very limited and expensive)

Free: water (from a sink or drinking fountain), air, gravity, and sand or coins from your own pockets. Also on the table: one free sticker per team. It is not a material and does not go on your bill.

Only Store items and the free list may be built into your device. No electronics or outside parts.

Machine Shop

You can also cut your own holes if you buy scissors. Is the machine shop worth $50? That's a business decision.


6. The Government

The Government has a fixed budget for all companies (about $8,000). It may fund zero, one, or several proposals. If your proposal looks too expensive or unrealistic, it will not be funded.

The proposal (due at minute 12)

Fill in these two sections on your worksheet and hand it in:

  1. A drawing of your device, labeled with materials and rough dimensions.
  2. Your requested budget, built from the cost worksheet (labor + materials + machining + certified tests).

Padding your budget makes you look expensive, and a cheaper competitor may win the money. Underestimating means you eat the overrun. A cheaper, credible plan is more likely to be funded.


7. Testing

Practice runs (free)

Use the practice timer as often as you want. The app shows a target of 30 seconds and starts a hidden clock when you press the space bar. Use your device, and when you think 30 seconds have passed, press the space bar again. The app shows how far off you were.

Certified tests ($500 each, paid to the Government)

A certified test is an official, witnessed run that goes on the record.

Passing means the certified time is within ±3 seconds of 30 seconds.


8. The Market

The market expects to buy about 500 sensors in total, at $200 each. It buys only from companies with a successful demo, meaning a certified test within ±3 seconds of 30 seconds.

How the 500 units are split

Example with 3 successful companies: A is most accurate (2 shares), B is first to market (2 shares), C is neither (1 share). That's 5 shares, so each share is 100 units: A sells 200, B sells 200, C sells 100.

If one company wins both bonuses, it gets 3 shares. Ties in accuracy go to the earlier final report.

Your payout

Payout = units sold × ($200 − your cost per unit).

Worked example: A device uses two small cups ($20 each), one length of twine ($30), and one length of tape ($40). Cost per unit = $110, so profit per unit = $90. If this company is company C above (100 units), its payout is 100 × $90 = $9,000.

If no team passes ±3 seconds

That just means the technology is less mature than the market hoped. Nobody is a "successful company," and the bonuses are not awarded. The market will place a small pilot order of 100 units with the closest team within ±5 seconds, if there is one. If nobody is within ±5 seconds, there are no sales.


9. The Final Report (due minute 30)

Your finish time is the minute you submit the report. Labor stops then. A team with no report makes no market sales. The report must contain:

  1. Team name and members with class years.
  2. Certified test result(s) you are claiming (the Test Operator will confirm against the app log).
  3. Total project cost: labor, materials, machining, and certified tests.
  4. Bill of materials for one unit, and the resulting cost per unit.
  5. A drawing of the device as built.
  6. Whether you are claiming a successful demo, and any bonus (most accurate or first to market).
  7. Your net profit (see below).

Everything except the certified test log is self-reported. Be honest and keep your worksheet neat. The organizers may spot check, and misreporting will disqualify a team.

Scoring: who wins?

The winner is the company with the highest net profit.

Net profit = government grant + market sales − labor − materials − machining − certified test fees

Everyone starts at $0. Negative is possible.

Illustrative example (your numbers will differ):

  Amount
Grant received +$2,800
Market sales (100 units × $90) +$9,000
Labor (28 min × $65) −$1,820
Materials −$180
Machine shop (1 hole) −$50
Certified tests (2) −$1,000
Net profit +$8,750

10. Rules


11. Who's Who

Role What they do
Government Reviews proposals and awards grants. Also responsible for running certified tests
Machine Shop Drills holes for $50 each.

12. Tips for Getting Ready


Revision #1
Created 2026-09-28 04:06:32 UTC by Jonathan Wheeler
Updated 2026-09-28 04:07:28 UTC by Jonathan Wheeler